WhatsApp

Every single job we've done has been rated 5★. You're in safe hands.

Back to The Fount
Calculator

Jet Washing Time & Coverage

How long a jet wash actually takes — and whether your surface needs resanding or sealing afterwards.

Area
40
Time on site
2.9 hrs

Single operator, professional kit

Water used
2052 L

Roughly — petrol washer at 12 L/min

After the wash

Re-sand the joints. Block paving loses kiln-dried sand under pressure. We brush in fresh sand the same day; without it, weeds return within a season.

Consider sealing. A breathable sealer extends the life of the clean by 2–3 years and stops moss returning quickly. Decking benefits most.

A heavy-clean job usually surfaces problems too — cracked slabs, sunken blocks, drainage issues. We'll point them out without pressure to act.

Want it actually clean?

Send us a photo and your postcode — we'll quote with sand, sealer and disposal options.

Get a quote